Open main menu

Gobblerpedia β

Changes

CAD and Visualization Laboratory

40 bytes added, 18:22, 28 January 2013
Compute Clusters: Corrected number of cluster nodes
== Compute Clusters ==
* 16<strike>15</strike> 14-node old cluster
** Each has Intel(R) Pentium(R) D CPU 3.00GHz CPUs, 8 GBytes RAM, 1 Gbit/sec ethernet
** Remote access available through ssh to <code>cvl.ece.vt.edu</code>. Individual nodes are <code>cvlXX.ece.vt.edu</code>
** MPI is installed, qsub can be used to parallelize things
** X11 is also installed, so <code>ssh -X cvl.ece.vt.edu</code> can be used to remotely run GUI applications.
* <strike>32</strike> 31-node blade cluster
** 16 nodes with 2x Quad-Core AMD Opteron(tm) Processor 2350 2GHz, 20 GBytes RAM, 1 Gbit/sec ethernet (<code>cluster[01-16]</code>)
** 16 nodes with 2x Quad-Core (8 threads) Intel(R) Xeon Processor E5620 2.40 GHz, 24 GBytes RAM, 1Gbit/sec ethernet (<code>cluster[17-32]</code>)
Anonymous user